What is the process for replacing and repairing die casting machine template?

Publish Time: 2025-01-14
First, before replacing or repairing the die casting machine template, a comprehensive equipment inspection must be carried out. This includes checking the overall operating status of the die casting machine, the connection of the electrical circuit, and the lubrication status of each lubrication point to ensure that the die casting machine is in a safe and operable state.

Secondly, preparation is essential. Prepare the corresponding special tools such as pallets and hangers according to the size and type of the die casting machine template to be replaced. At the same time, check the new die casting machine template to be replaced to ensure that it is intact and meets the requirements for use.

Next, enter the formal disassembly stage. First remove the fixed die casting machine template, separate it from the die casting machine, and place it in a safe location. Then, follow the prescribed steps to remove the dynamic die casting machine template, runner system, and die casting machine housing and other components in turn. During the disassembly process, pay special attention to maintaining balance to prevent the mold from slipping and causing personal injury.

After the disassembly is completed, the old die casting machine template is inspected and evaluated as necessary. If the die casting machine template is only slightly damaged, it can be repaired; if the damage is serious, a new die casting machine template needs to be replaced. Repair work may include grinding, polishing, and repair welding to ensure that the repaired die casting machine template can meet the use requirements.

After the replacement or repair is completed, the die casting machine template is installed. Install the new die casting machine template or the repaired die casting machine template on the die casting machine in the prescribed order and orientation, and lock it with the corresponding locking mechanism. Ensure that all connections and seals are properly assembled and there is no leakage.

After the installation is completed, a trial run test is carried out. Start the die casting machine and check whether the new die casting machine template or the repaired die casting machine template runs smoothly without abnormal sounds or vibrations. At the same time, observe the molding effect of the die casting to ensure that it meets the quality requirements.

Finally, after all operations are completed, clean up the site and dispose of the remaining materials. Ensure that the working environment is clean and orderly to prepare for subsequent die casting production. At the same time, return and maintain the tools and equipment used in the replacement or repair process for the next use.
×